Welding and steel structures in Vantaa
We weld steel structures and metal products to certified standards. Besides MIG/MAG and TIG welding we use a welding robot for repeat series. CE-marked structures in execution classes EXC1–EXC2.
Technical details
- MIG/MAG welding
- TIG welding
- Welding robot
- EN 1090 EXC1–EXC2
- EN ISO 3834-3
- Documented quality control
Certified welding in Vantaa
Our workshop is certified to EN 1090 in execution classes EXC1–EXC2, and our welding quality management meets EN ISO 3834-3. That is why we can supply CE-marked steel structures for construction projects.
We serve companies in Vantaa, Helsinki, Espoo and across Uusimaa – both single structures and repeat series.
Welding methods
- MIG/MAG welding for steel structures
- TIG welding for stainless and thin materials
- Welding robot for repeat series
- Documented quality control and traceability
From drawing to finished structure
We cut the parts by laser or flame cutting, bend them on a 220 tonne CNC press brake and weld the structure in the same workshop. Surface treatments such as painting and hot-dip galvanising are handled through our partners. You get the whole structure from one supplier with one quote.
What does welding cost?
The price depends on the size and complexity of the structure, the welding method, material, quantity and the required execution class and documentation. Send a drawing and you get a quote within 24 hours on weekdays.
Frequently asked questions
Can structures be CE marked?
Yes, in EN 1090 execution classes EXC1–EXC2.
Do you weld stainless?
Yes, with TIG welding.
Can you make the whole structure from a drawing?
Yes – cutting, bending and welding in one workshop.
What does EXC2 mean?
An EN 1090 execution class required for most load-bearing steel structures in buildings. We are certified for EXC1–EXC2.
Do you weld series?
Yes – for repeat series we use a welding robot.
Other services

Send a drawing
DXF, DWG, PDF or image – a photo of a sketch is fine. We reply within 24 hours on weekdays. Parts ready from 2 working days.
